Case Studies - Fabrication

Aerated Sludge Tank – Scum Board Replacement Programme Aerated Sludge Tank – Scum Board Replacement Programme

Aerated Sludge Tank – Scum Board Replacement Programme

TEXO are an established Framework Contractor for our customer, a major UK water company serving 5.5M customers....
Rope access maintenance overhaul at Fryston Rope access maintenance overhaul at Fryston

Rope access maintenance overhaul at Fryston

As a primary contractor for Yorkshire water, the TEXO team was asked to investigate a screen fault. When our engineer got to the site...
High risk confined space project for Yorkshire Water High risk confined space project for Yorkshire Water

High risk confined space project for Yorkshire Water

We work with Yorkshire Water on an ongoing basis, helping the company to manage its assets – particularly those where access is difficult or potential...
HEATHROW STATIC SECURITY MODULES HEATHROW STATIC SECURITY MODULES

HEATHROW STATIC SECURITY MODULES

We were approached to understand whether our modular systems would be capable of operating with the sensitive security equipment that is found at any ...
GATWICK AIRPORT MODULAR ATC DATA CENTRE GATWICK AIRPORT MODULAR ATC DATA CENTRE

GATWICK AIRPORT MODULAR ATC DATA CENTRE

Gatwick Airport were tasked with updating the Airports Air Traffic Control Systems and as such needed to keep the existing systems live, whilst instal...
Six modular classrooms Install for Castleview Primary School Six modular classrooms Install for Castleview Primary School

Six modular classrooms Install for Castleview Primary School

Our client, Amey, was working with Castleview Primary School is situated in Craigmillar, south east Edinburgh to expand the school’s facilities....
Heathrow Baggage Reconciliation Facility Heathrow Baggage Reconciliation Facility

Heathrow Baggage Reconciliation Facility

Heathrow Airport had an urgent requirement to provide a stand-alone Baggage Handling Facility in the heart of its live Operations at Terminal 5...
LONDON CITY AIRPORT BAGGAGE HANDLING FACILITY LONDON CITY AIRPORT BAGGAGE HANDLING FACILITY

LONDON CITY AIRPORT BAGGAGE HANDLING FACILITY

As part of London City Airport’s Capital Development Plan, there was strategic requirement to remove the existing Baggage Handling Facility and replac...
One-Stop Subsea Vessel EPC Support One-Stop Subsea Vessel EPC Support

One-Stop Subsea Vessel EPC Support

We were contracted by a subsea operator to work on a deck spread design, engineering, fabrication and installation project, in support of its upcoming...
Modifying Platform Interface Stair Tower Modules Modifying Platform Interface Stair Tower Modules

Modifying Platform Interface Stair Tower Modules

Our client asked us to manage modifications to two existing stair tower modules – originally designed, fabricated and installed by TEXO...
Fabricating a turntable assembly for mobile crane Fabricating a turntable assembly for mobile crane

Fabricating a turntable assembly for mobile crane

This was our first fabrication project for Mammoet, working with them to fabricate the turntable unit from their own design. We were able to work clos...
Successful fabrication of 30-metre spud can and extensions Successful fabrication of 30-metre spud can and extensions

Successful fabrication of 30-metre spud can and extensions

TEXO Port Services has completed a number of successful projects with Osbit, a sub-sea engineering and offshore technology company. The client asked u...
Multi-disciplinary project for well test overboard vent line Multi-disciplinary project for well test overboard vent line

Multi-disciplinary project for well test overboard vent line

This project used the full breadth of our multi-disciplinary approach to client work and presented a number of challenges to the team....
Full manufacture of riser-less tower module Full manufacture of riser-less tower module

Full manufacture of riser-less tower module

This was a complex project that required strict adherence to welding practices and procedures, along with a focus on machine finish tolerances. We met...
FAST TURNAROUND BY MODULAR BUILD TEAM ON ROV CONTROL CABIN FAST TURNAROUND BY MODULAR BUILD TEAM ON ROV CONTROL CABIN

FAST TURNAROUND BY MODULAR BUILD TEAM ON ROV CONTROL CABIN

Following an urgent request for an A60 Safe Area ROV Control Cabin just before the festive break, the modular build team at TEXO Workspace Solutions h...
VSD Container for Valaris 123 Installation VSD Container for Valaris 123 Installation

VSD Container for Valaris 123 Installation

TEXO Workspace Solutions were requested to carry out the Design, Manufacture and Testing of an insulated and lined VSD Switchgear container for the Va...
J-Lay Tower Installation J-Lay Tower Installation

J-Lay Tower Installation

This extremely complex operation was successfully completed as a result of excellent detailed planning, involving the world largest Offshore crane, th...
Viking Neptun Mobilisation Viking Neptun Mobilisation

Viking Neptun Mobilisation

TEXO Port Services was contracted to manage the mobilisation of the Viking Neptun – a large high-capacity Construction Support Vessel. ...
Subsea Trencher Mobilisation Aboard The Rem Cetus Subsea Trencher Mobilisation Aboard The Rem Cetus

Subsea Trencher Mobilisation Aboard The Rem Cetus

TEXO Port Services was asked to support the mobilisation of a subsea trencher, deck winch and containers aboard the REM Cetus – a large cargo ship. We...
DNV 2.7-2 Safe Area Modules DNV 2.7-2 Safe Area Modules

DNV 2.7-2 Safe Area Modules

We were asked to design and build a set of four office and workshop modules for an existing client. These modules needed to be fully fitted-out so tha...
Tolmount Platform Interface Tolmount Platform Interface

Tolmount Platform Interface

TEXO Engineering and Fabrication was contracted to carry out the design, construction and installation of this platform interface. The project also re...