Case Studies

Live Remote Worker Test for UTEC Survey Live Remote Worker Test for UTEC Survey

Live Remote Worker Test for UTEC Survey

UTEC Survey is an international company providing survey, positioning and data management services to both onshore and offshore projects. The company ...
Four-way Line of Sight View For Royal IHC J-Lay Tower Four-way Line of Sight View For Royal IHC J-Lay Tower

Four-way Line of Sight View For Royal IHC J-Lay Tower

Royal IHC asked us to work with them on the installation of the newly-built, 1500-ton J-Lay tower for McDermott International Ltd, onto its converted ...
Improving Heavy Lifting Safety at the Port of Blyth Improving Heavy Lifting Safety at the Port of Blyth

Improving Heavy Lifting Safety at the Port of Blyth

TEXO Port Services has a duty of care to ensure safety during quayside operations. Moving cargo and equipment from vessel to dock requires heavy lifti...
Vent Line Pipe Clamp Design & Manufacture Vent Line Pipe Clamp Design & Manufacture

Vent Line Pipe Clamp Design & Manufacture

TEXO Engineering & Fabrication was commissioned by our client to carry out an offshore survey of the Stbd Leg to allow for a method of supporting an 8...
Replacing Mud Pump Pressure Relief Valves Replacing Mud Pump Pressure Relief Valves

Replacing Mud Pump Pressure Relief Valves

TEXO Engineering & Fabrication was commissioned by our client to carry out an offshore survey of three Mud Pump Pressure Relief Valves (PRVs) and asso...
Aft Mast Fabrication for Clients New Ferry Aft Mast Fabrication for Clients New Ferry

Aft Mast Fabrication for Clients New Ferry

One of TEXO’s new clients in the marine sector after completion of the tendering and audit process were awarded the Aft Mast Fabrication for one of it...
Multi-disciplinary Solutions for Platform Interfacing on Client Decommissioning/Plug and Abandonment Campaign Multi-disciplinary Solutions for Platform Interfacing on Client Decommissioning/Plug and Abandonment Campaign

Multi-disciplinary Solutions for Platform Interfacing on Client Decommissioning/Plug and Abandonment Campaign

The Client asked us to look at the Interface between the Jack-Up Rig and the fixed Installation by means of a bridge access platform. Our client’s req...
11,000 Man-hour Fabric and Maintenance Programme for Valaris 11,000 Man-hour Fabric and Maintenance Programme for Valaris

11,000 Man-hour Fabric and Maintenance Programme for Valaris

Valaris commissioned TEXO Asset Integrity to work on the Gorilla V, and offshore drilling jack-up rig. The fabric and maintenance project included the...
Demob Project for Offshore Supply Vessel During COVID Restrictions Demob Project for Offshore Supply Vessel During COVID Restrictions

Demob Project for Offshore Supply Vessel During COVID Restrictions

This project had a large scope of work to be completed to a very tight time frame – and within the COVID-19 restrictions in place at the time. This me...
On-Site Welfare and Office Facilities For 30 Staff On-Site Welfare and Office Facilities For 30 Staff

On-Site Welfare and Office Facilities For 30 Staff

We proposed an interconnected modular building design which would create a flowing work area for both contractors and office staff. Within this modula...
Offshore Wet-Room And Dry Store Floor Replacement Offshore Wet-Room And Dry Store Floor Replacement

Offshore Wet-Room And Dry Store Floor Replacement

We were approached by a current client and asked to survey and provide a proposal to remove the existing floor and to put down new floor finishes in 3...
Expanding On-Site Facilities For A Growing Workforce Expanding On-Site Facilities For A Growing Workforce

Expanding On-Site Facilities For A Growing Workforce

The new module was constructed in our facility in Aberdeen and was outfitted with an additional office area. The module was transported to site when i...