The challenge was to provide at very short notice, a completed Accommodation facility to house the Staff from the old RGS facility based near Terminal...
Gatwick Airport were tasked with updating the Airports Air Traffic Control Systems and as such needed to keep the existing systems live, whilst instal...
As part of London City Airport’s Capital Development Plan, there was strategic requirement to remove the existing Baggage Handling Facility and replac...
Following an urgent request for an A60 Safe Area ROV Control Cabin just before the festive break, the modular build team at TEXO Workspace Solutions h...
TEXO Workspace Solutions were requested to carry out the Design, Manufacture and Testing of an insulated and lined VSD Switchgear container for the Va...
We proposed an interconnected modular building design which would create a flowing work area for both contractors and office staff. Within this modula...
The new module was constructed in our facility in Aberdeen and was outfitted with an additional office area. The module was transported to site when i...
We were asked to design and build a set of four office and workshop modules for an existing client. These modules needed to be fully fitted-out so tha...