< All Case Studies

Workspace Solutions > <

Delivering Complex Refurbishments on the Safe Concordia

The challenge

The Safe Concordia, a semi-submersible accommodation vessel, required extensive and critical refurbishment across multiple areas of its accommodation block while operating in a busy offshore environment. The scope of work was wide-ranging, from replacing flooring in 64 wet rooms to refurbishing offices, mess halls, and recreational areas. A significant challenge was the tropical climate of the Caribbean and the Gulf of Mexico (GOM), which complicated the curing times of screed and epoxy resins due to high air moisture. Furthermore, the nature of the vessel’s operations meant the work would be carried out in various locations, requiring an agile and adaptable project team.

Delivering Complex Refurbishments on the Safe Concordia

The solution

Leveraging our long-standing relationship with Prosafe, our team successfully secured the project and deployed a specialist crew to manage the complex refurbishment. The project was executed with a focus on efficiency and quality, using materials specifically suited for the challenging offshore environment. These included Decor flake Epoxy Resin Flooring, IMO Vinyl Flooring, and FR Furniture, along with A60 fire-rated doors for enhanced safety. To counter the climate challenges, our on-site team implemented a flexible work schedule and adjusted processes to ensure proper material curing, maintaining the project timeline. A key to our success was the ability to carry out the work while the vessel was operational and on the move, showcasing TEXO’s unique capability to manage complex logistics.

Delivering Complex Refurbishments on the Safe Concordia

The result

Over a three-month period, TEXO completed the extensive refurbishment to the client’s full satisfaction. Despite the logistical and environmental complexities, the project was delivered in a safe and timely manner, a testament to our team’s professionalism and expertise. The successful completion of this project reinforced our reputation as a trusted partner for Prosafe and demonstrated our ability to handle multi-faceted offshore refurbishment work under challenging conditions. The client was delighted with the quality of the work and the seamless execution, highlighting the value of our successful collaboration.

Delivering Complex Refurbishments on the Safe Concordia

More case studies